That location, along with several others along Santa Fe Avenue, could not be repaired with the concrete cutting performed (the sidewalk section will need to be replaced). Based on current funding, we do not have a good estimate on when the replacement will be conducted, nevertheless, this area must be corrected. MGK
3 Comentars
Hamden, CT (Oficial verificado)
Engineering Inspector (Oficial verificado)
Reconocido Engineering Inspector (Oficial verificado)