That location, along with several others along Santa Fe Avenue, could not be repaired with the concrete cutting performed (the sidewalk section will need to be replaced). Based on current funding, we do not have a good estimate on when the replacement will be conducted, nevertheless, this area must be corrected. MGK
3 Comments
Hamden, CT (Verified Official)
Engineering Inspector (Verified Official)
Acknowledged Engineering Inspector (Verified Official)